Byond Interiorz

Electrical

Switch & Light Installation/Replacement, External Electrical Work

Terms for Electrical Services

  1. Wiring:
    • Wire Joining: Wires up to 2 meters will be joined with the existing wiring, provided the existing wiring is accessible.
  1. New Electrical Points:
    • No New Points: No new additional electrical points will be added or installed from the Distribution Board (DB) under this contract.
  1. Concealed Wiring:
    • Concealed Wiring: Concealed wiring will only be replaced or repaired if it is possible without causing breakage to the walls or ceilings. Any work that requires damage to the structure will not be covered.

General Terms

  1. Spare Parts / Materials: All spare parts / materials required for repairs or replacements will be separate from the service cost. Spare parts will be provided only upon the client’s request and will be billed at actual cost without any markup.
  2. Service Duration: A maximum of 3 hours of work will be provided per visit. Any additional time required beyond 3 hours will be subject to prior approval and may incur additional charges.
  3. Payment: The payment for the AMC will be taken 100% in advance. The tenure will start from the day of the payment received and any service required will be done only after the payment is received.
  4. Service Delay: We will make every reasonable effort to provide timely service under this Annual Maintenance Contract (AMC). However, services may be delayed or rescheduled in the event that the request falls on or immediately before any major national, regional, or religious festival (such as Diwali, Eid, Holi, Christmas, Ganesh Chaturthi, etc.).
Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare